The documents are written by the other side
Your contract, your specification and your progress claims are all drafted by people whose interests are not identical to yours. That does not make them dishonest. It makes them one-sided.
Independent engineering review · Western Australia
Independent review of contracts, drawings, progress claims and defect reports for people building in Perth and across WA — by a civil engineer who has spent his career standing on one side of a project. Never the builder's.
Reviews are carried out personally by Dima Berkovich, Civil Engineer, Technion graduate, on the Israeli Register of Engineers and Architects since 2017.
Read this first
I am a civil engineer registered in Israel, not in Western Australia. I do not attend site, I do not certify works, and I do not sign anything that a WA-registered practitioner must sign.
What I do is read what you have been handed — the contract, the drawings, the specification, the progress claim, the defect report — and tell you in plain English what it says, what is missing from it, and what to ask before you sign or pay.
Where something needs a local registered practitioner — a building surveyor, a structural certifier, a site inspection — I will say so. Often the most useful thing I give you is the exact list of what to ask them for.
Why bother
Your contract, your specification and your progress claims are all drafted by people whose interests are not identical to yours. That does not make them dishonest. It makes them one-sided.
By the time a problem is visible, the cheap moment to have caught it has usually passed. Almost everything worth catching is catchable on paper, months before it is catchable on site.
The cost of having someone read your contract properly is a rounding error against the cost of a variation you did not need to accept, or a dispute you did not need to have.
What I review
Each one is a fixed-fee piece of work. You can start with one and stop there.
The building contract and the specification decide most of what you will argue about later. They are written by the builder's side, and the gaps in them are rarely accidental.
Drawings from different consultants are meant to agree with each other. Very often they don't, and the clash is discovered on site at the worst possible moment.
A progress claim is a statement of how much of your building exists. It is worth checking against the building, not against the schedule.
An inspection report can list forty items without telling you which three matter. I read the report you already paid for and tell you how to read it.
Handover is the last moment when the builder still needs something from you. What you do not raise then becomes your problem.
Buying off the plan means buying a description. The description is the only thing you can hold them to.
How it works
Contract, drawings, specification, claim, report — whatever the question is about. PDF, photos of paper, a shared folder; it does not matter. If you are not sure what is relevant, send more.
Twenty to thirty minutes to understand what you are worried about and what decision you are facing. Perth afternoon is Israel morning, so this is easier than it sounds.
In plain English: what the documents say, what is missing, what I would ask, and what I would not sign without. Usually within three business days. Fixed fee, agreed before I start.
Questions
No. I am registered in the Israeli Register of Engineers and Architects and have been since 2017. I do not hold myself out as a WA-registered engineer, I do not certify work, and I do not take on anything that WA law reserves for a registered local practitioner. What I provide is an independent professional review of documents, as an advisor to you.
Not in person. For a physical inspection you need someone local, and I will tell you what to ask them to look at. What I can do is review the report they produce, which is often where the real value is — a report is only as useful as your ability to read it.
Concrete, drainage falls, waterproofing details and construction sequencing behave the same way everywhere; the reference numbers differ, the physics does not. Where a question turns on a specific Australian Standard or on the National Construction Code, I will say that it needs a local check rather than guess. I would rather hand you a precise question than a confident wrong answer.
A written opinion usually within three business days of receiving the documents. If you are facing a deadline — a payment due, a contract to sign — say so and I will tell you honestly whether I can meet it.
A fixed fee per review, quoted after I have seen the documents and before I start work. Not an open-ended hourly rate. If the scope turns out to be larger than it looked, I come back to you before doing the work, not after.
Then ask it. Not everything needs a formal review, and if a short answer is genuinely enough I will say so rather than invent a scope of work.
Contact
Tell me what you are facing and what you have to decide. I will tell you whether I can help, and what it would cost, before any work starts.